Awesome
Professor Neal was a great teacher. I'm looking forward to taking ECE103 under her as well.
Awesome
Prof. Neal really has the strongest work ethics at this school. She really deserves to be given credit She has a good sense of humor, but you can see that she takes her job seriously as well. She has high expectations though. Do not take her if you're only taking ece102 to see if engineering is for you because she will make you run the opposite direction.
Chandler Gilbert Community College - Engineering
Master of Science
Manufacturing Systems Engineering
Bachelor of Science
Electrical Engineering
Kettering University
Management
Budgets
Contract Management
Leadership
Construction
Engineering
Lean Manufacturing
Neal
Nichole
Chandler/Gilbert Community College
Chandler Gilbert Community College
Delphi
Dayton Public Schools
Rock Valley College
The Walder Hill Group
Parsons
Wild Horse Pass Development Authority
Rockford
Illinois
Instructor
Rock Valley College
Chandler
AZ
Facility community meetings to discuss local commercial development opportunities. Plan
manage
and closeout operational and construction related projects. Strong team building and customer service skills.
Commercial Development Planner
Wild Horse Pass Development Authority
Supervised 20 - 30 hourly union personnel in injection molding department as well as air bag module assembly. Responsible for maintaining equipment
scheduling plan maintenance
and analyzing data to identify and eliminate most frequent machine failures in order to increase productivity.\nOvervie Increased third shift hourly production by 20% and played an essential role in meeting 100% on time shipping; Maintained equipment to meet QS 9000 and ISO 9001quality standards.\nWrote standardized work procedures to ensure quality standards were met.\nUsed PLC-5 controls to troubleshoot air bag module assembly cells.\nMaintained injection molding equipment and scheduled dies for planned and emergency maintenance.\nImplemented a computerized maintenance management system to schedule planned and preventative maintenance resulting in increased machine uptime and labor productivity.\nSupervised skilled tradesmen that responded to service calls
maintaining an average response time of ten minutes.\nPlanned and scheduled work including the ordering of materials for skilled trades group that performed internal construction projects.\nDeveloped work scopes
schedules
and procured outside labor for major equipment relocation projects and office reorganization projects.\nImplemented and managed a CMMS to track work orders
planned and preventative maintenance.
Delphi
Lean Material Movement Coordinator / Supervisor / Engineer
Completed 5 year cooperative learning that included a thesis on power distribution on the manufacturing floor. Supervised a group of special project maintenance group. Managed planned and preventative maintenance plans. Implemented a computer maintenance management system. Experienced in union grievance disputes and resolutions. Extensive experience in several manufacturing processes; injection molding and assembly cells. Products include energy absorbers
instrument panels
door panels
and inflatable retraint systems.
Delphi Automotive Systems
Parsons
Initially hired to manage K-12 education job order contracting projects
then assigned to Wild Horse Pass Hotel and Casino project to procure and manage various professional and vendor contracts for the $200M project. Became the administrator of the project management software
budget manager
invoicing specialist
and quality manager for the $300M program budget.\nOvervie Facilitated 30 day payment to vendors with cost control procedures and identified over 100 non-conformances through the development of a quality assurance / control plan.\nTracked and managed a $10M Infrastructure budget that realized an approximate $1M savings.\nManaged detailed funding streams from four separate public agencies.\nReviewed change requests realizing $100K's client savings due to contractor unsubstantiated requests.\nImproved client relations
client requested reassignment of three PM's; 6th largest urban K-12 public school district in the state of Ohio
Project Manager
Chandler
AZ
Currently contracted with the Arizona Association for the Education of Young Children to provide special event and administrative coordination. Maintain correspondence with five local affiliates across the state. Provide website information updates
social media updates
and issue bi-monthly e-newsletter. Accomplishments include delivering the organization's first statewide professional development conference where over 300 early childhood professionals attended across the state and planning the third annual Week of the Young Child kick-off event with the Arizona Diamondbacks that resulted in a 96% increase in ticket sales.
Managing Partner
The Walder Hill Group
Plan
manage
and oversee capital improvement projects for the districts 71 active / inactive buildings. Participated in procurement of CMMS to track maintenance orders. Manage and negotiate utility budget. Supervised two project managers and a health and safety coordinator. Role transitioned into the master planning
community outreach and over site of a $600M capital improvement program in partnership with the State of Ohio School Facilities Commission to renovate and / or build new the district's educational facilities.\nOvervie Participated in the development of a master plan and design to rebuild
renovate
and improve 47 schools in a 10 year period. Including overseeing the planning
design
and construction of a 100 year old historic renovation for Stivers School for the Performing Arts
totaling more than $40M and over 100
000 square feet of educational and performing space.\nConducted over 100 community meetings.\nWrote request for proposals for the procurement of various services including professional
technology
and skilled labor totaling approximately $100M.\nRealized approximately $100K in savings for the district by challenging state funding guidelines.\nDeveloped and managed \"Student Connections\" program that educated K-12 students in the construction program and contractors in the educational process resulting in the placement of five high school interns and more than 100 hours of contractors volunteering in the schools.\nIncorporated sustainable practices in the construction of the facilities
one example would be using ground up building materials from the demolition of dilapidated schools as engineered fill for the foundation of new state of the art school facilities.
Director of Engineering
Dayton
Ohio Area
Dayton Public Schools
Arizona
Engineering Faculty
Chandler/Gilbert Community College
Chandler
AZ
Teaching Engineering Analysis Tools and Techniques.
Adjunct Professor
Chandler Gilbert Community College