Western Wyoming Community College - Computer Science
International Association of Electrical Inspectors
IAEI Utah Chapter
State of Utah
Fundamentals of Engineering (FE)
Computer Hardware
Customer Service
X86
Electricians
Electronics
Materials Management
Root Cause Analysis
Blueprint Reading
Management
Project Management
Engineering Management
Customer Support
Human Resources
Electrical Engineering
Training
Testing
Budgets
Teaching
Systems Engineering
Troubleshooting
Patterson Jr.
Norval Joe
IP Network Solutions
USAF / A10 Thunderbolt
OCI Inc.
USAF / F16
Rohmann Services
Inc.
USAF / A-10 Thunderbolt
Cache Valle
Wasatch and Mountain West
ATK Space Systems
PELATRON TECHNOLOGIES LLC
USAF / F16
T2 Engineering
USAF / ICBM
Hill AFB
Utah
Develop procedures and tools for testing
verification and certification of operational flight programs (OFP)
cooperating with the developers\nValidate testing activities and results for operational flight programs\nEnsure accurate document
record and archive data pertaining to program parameters and process control performance
Senior Test Engineer
OCI Inc.
USAF / F16
Hill AFB
Develop procedures and tools for testing
verification and certification of operational flight programs (OFP)\nValidate testing activities and results for operational flight programs\nEnsure accurate document
record and archive data pertaining to program parameters and process control performance\nUtilized CLM (Collaborative Lifecycle Management) and Dimensions for Requirements management
Quality management and Configuration Management\nCooperated with the development team in troubleshooting anomalies
Senior Test Engineer
PELATRON TECHNOLOGIES LLC
USAF / F16
Salt Lake City
Startup and installation of environmental instrumentation systems\nSupervised technicians\nMaintained materials inventory as needed\nQuality assurance for compliance with specifications and codes.
Electrical Supervisor
Cache Valle
Wasatch and Mountain West
Hill AFB
Utah
Verification
Validation and testing of ICBM upgrade\nWitnessing and verifying test results at LMTF for LCCBU\nAnalysis and assessment of test results and program documentation\nResearching
planning and executing document control and quality assurance\nPreparing program documentation in response to federal regulation and contract requirements\nConsulting on appropriate test and program documentation\nPreparing and updating PESHE
PPP
SEP and program documents as required\nReview of drawings
Principle Electronics Engineer
T2 Engineering
USAF / ICBM
HILL AFB
Utah
ROHMANN SERVICES 309TH AFMC 520 SMXS/MXDEE February 2015 – Present\n\nDevelop procedures and tools for testing
verification
and certification of integrated avionics equipment (LRU’s) and operational flight programs (OFP)
cooperating with the software developers \nEnsure the equipment is properly tested
calibrated
and certified according to the corresponding procedures\nValidate testing activities and results for operational flight programs\nEnsure accurate document
record
and archive data pertaining to program parameters and process control performance\nAssist and train the Equipment Test Specialists
when required
in troubleshooting and repairing damaged equipment for the customers
Lab Manager / Test Engineer
Rohmann Services
Inc.
USAF / A-10 Thunderbolt
Promontory Point
Utah
Project Management; Included project cost
schedule control and project coordination.\nDesign Engineering; Included designs
calculations
code and standard compliance
estimates
material lists
specifications and CADD drawings for facilities projects including new facilities/equipment and modifications to existing facilities/equipment.\nField Engineering; Included helping construction personnel with design questions and overseeing the construction of facilities projects for compliance with drawings
specifications
codes and standards.\nPlant Engineering; included troubleshooting facility and equipment problems
maintenance support and reliability engineering.\nCustomer Support; included interfacing with all organizations on facilities related issues.
Facilities Electrical Engineering
ATK Space Systems
Hill AFB
Utah
IP Network Solutions 309TH AFMC 519 SMXS/MXDEB\t\tAugust 2012 – Present\n\nManage effective Inventory Control Database\nAcquire Line Replaceable Units (LRU’s) in support of the Systems Integration Lab (SIL)\nSustain Government Furnished Equipment (GFE) in support of Contractors\nEnsure supportability of Special Purpose Recoverable Authorized Maintenance (SPRAM) account\nImplemented form 8 Lone/Lease agreements with contractors\nD6/D7 (exchange) damaged equipment from Supply\nDispose of obsolete equipment to the Defense Reutilization and Marketing office (DRMO)\nTroubleshoot equipment to provide repair instructions for the Depot\nAudit computer hardware and LRU’s
Hardware Engineer / Equipment Specialist
IP Network Solutions
USAF / A10 Thunderbolt
Bachelor of Science (BSEET) Degree
Cum Laude
Electronic Engineering Technology with EIT
Weber State University
Utah Master Electrician
State of Utah
181900-5502
Utah Electrical Inspector
State of Utah
181900-5602
Electrical Inspector
IAEI
Associate of Art (AA) Degree
Member of PTK Honor Society
Electrical Technology
Faculty Senate
Western Wyoming Community College